Bridges
Bridge & Underpass (Intersection of Pr. Muteib St., Pr. Naif St., & Al-Khalifa Othman Bin Afan St.) – Dammam



231M
SAR
Total value
2016
-
Completion date
Length: 7.124 km
Volume of concrete ( Lower Structures ): 62,835 m³
Volume of concrete ( Upper Structures ): 23,648 m³
Excavation: 26,337.66 m³
Prestressed Steel: 710.60 t