Bridges
                                    Bridge (Intersection of Arafat Rd. & Aziziyah Rd.) – Riyadh
                                    
                                    
                                    89.1M
                                        SAR                                    
                                Total value
2020
                                    -
                                    
                                Completion date
                                • 900 M in length • Volume of concrete: 25,000 m3 • Excavation: 10,000 m3 • Steel:5,000 tons