Underpass
The completion construction of the tunnel King Khalid Rd. with King Fahd Rd. – Tabuk



91.9 M
SAR
Total value
2023
-
Completion date
• Length: 1.1 LM • Volume of Concrete: 55,000 M3 • Excavation: 128,000 M3 • Steel: 6,600 Ton