Bridge & Underpass (Intersection of King Khalid Rd. & Khaled Bin Al-Waleed St.) – Taif



113.7M
SAR
Total value
Ongoing
-
Completion date
• Two directions with three traffic lanes, with one direction lane for stopping • The net length of the bridge: 580 m • Bridge length with ascending and descending ramps: 1850 m • Volume of Concrete: 40,000 m³ • Excavation Work: 90,000 m³ • Filling Work: 70,000 m³ • Steel: 7,300 Ton