Construction of the King Abdulaziz Road intersection with King Abdullah bin Abdulaziz Road (2nd Stage) – Madinah



42.5 M
sr
Total value
2023
-
Completion date
• Distance: 900 LM in two directions with three traffic lanes in addition to a path for buses movement in each direction. • Deck Type: Cast in Situ Deck Slap (Box Section) • Volume of Concrete: 12,000 M3 • Excavation: 10,000 M3 • Steel: 3,200 Tons