MARINE

Bulk Terminal Berth # 10 (Yanbu)

134M

SAR

Total value

2016

-

Completion date

"Construction of a marine berth for handling bulk materials with a volume of 60,000 m 3 and a length of 300 m - dredging works with a depth of (-16.5 m) and a volume of 2,000,000 m 3 and a circulation basin in front of the berth - and the construction of the berth wall and the support area • Dredging quantity: 2,000,000 m3 • Stone backfilling: 50,000 m3 • Concrete quantity: 60,000 m3 • General Backfilling: 100,000 m3"