Independent Sewage Treatment Plant – Taif

117.5M

SAR

Total value

2022

-

Completion date

• Construction of All Civil works including Buildings, Water Tanks and Utilities including Underground piping works from 100 mm to 2500 mm • Plant Area = 90,000.00 m² • Excavation Volume = 130,000.00 m³ • Concrete Volume = 30,000.00 m³ • Steel Quantity = 3,500.00 t • Underground Pipes = 11,000.00 m • Masonry Works = 7,000.00 m² • Planting = 1,200.00 m² • Road Works = 15,000.00 m²