Bridge (Intersection of King Fahad Rd. & Sari St.) – Jeddah



92.8M
SAR
Total value
2021
-
Completion date
"Construction of a bridge in Sari St, at the intersection with King Fahd road the bridge is around 1000m length and 20m width with two traffic directions, 2 lanes in each direction including all required existing utility relocation, road works, landscape, shifting the existing monument and construction of a new stormwater network at the intersection area • Bridge Distance: 100 LM Length Including Bridge Ramps • Deck Type: Cast in Situ Deck Slap (Box Section) • Volume of Concrete: 35,000 M3 • Excavation: 30,000 M3 • Steel: 7,000 Tons"