Marine

Fishing Harbour – Tabuk

19.7M

SAR

Total value

2022

-

Completion date

"• Al-Qad - Dredging works 680,000m3 - Backfilling 220,000m3 and concrete pavements with a length of 100m and a depth of -3m - and floating docks 3000m in length and breakwater with a length of 1000m3 and another with a length of 600m3 - and electrical and mechanical works • Al-Mukehref - Dredging works 120,000 m3 - Backfilling 60,000 m3 - Protection works for concrete pavements 90 m and floating piers"

Bridges

Bridge (Intersection of King Abdulaziz Rd. & King Abdullah bin Abdulaziz Rd.) (3 Stages) - Madinah