197M

SAR

Total value

2018

-

Completion date

Exist Utilities Re-Routing (HV cable, fuel line 10" , Potable water Lines, Sewerage lines, Telecommunication lines, MV cables and storm drainage lines) ,piles work, excavation and dewatering, waterproofing, Concrete work, Road work. • Volume of Concrete: 86,483 M3 • Excavation: 90,000 M3 • Steel: 7,100 Tons 1/ Bridge: • 700 m length (3 lanes in each direction) • Pre-cast Post tensioned girders (U shape) 2/ Underpass: • 800 LM Length (2 Lanes in Each Direction) • Cast in Situ for Covered Area