BRIDGES

Construction Bridge at Imam Moslim with Wadi Baqra – Riyadh

87.3M

SAR

Total value

2018

-

Completion date

Traffic Detour / Excavation Works / 336 Conc Piles / 8 Foundation + 8 Pedestal / 2 Abutments / 32 Column / 8 Transversal Beam/ 8 Cap Beam / Insulation Works / 125 Pre-Cast Girsers/ 250 Elastomerique Bearing / Deck Slab / 850 M New Gersey / Side Walk / Post Tension Works. • Bridge Distance: 210 LM in Length, 2 Directions 4 Lanes in Each Direction • Deck Type: Pre-cast, Post Tensioned (T Girders) • Column Height: 28 LM • Volume of Concrete: 25,103 M3 • Excavation: 57,685 M3 • Steel: 6,409 Tons