48.6M
SAR
Total value
2017
-
Completion date
Project duration: 24 months
Bridge rump 300m include 2 Direction with 2 traffic lanes in each direction
Volume of concrete: 3,500 m3
Excavation: 35,000 m3
Steel: 4,000 tons