BRIDGES

Bridge of Nasar St with Azizia St – Riyadh

82.8M

SAR

Total value

2017

-

Completion date

Implementation of the traffic detours, relocation for public utilities obstructs with structures, cleaning, and removal of site obstacles, deep and shallow foundations, isolation, construction joints, and mechanical load devices, reinforcement, and metallic works, bridge deck with the prestressing concrete system, bridge ramps with the soil reinforcement system, road lighting, roads, and asphalt works and traffic management, agriculture and Irrigation. • Bridge Distance: 750 LM in Length, 3 Lanes in Each Direction • Deck Type: Cast in Situ Deck Slap (Box Section) • Volume of Concrete: 10,000 M3 • Excavation: 20,000 M3 • Steel: 3,500 Tons