BRIDGES
Bridge of Nasar St with Azizia St – Riyadh



82.8M
SAR
Total value
2017
-
Completion date
Implementation of the traffic detours, relocation for public utilities obstructs with structures, cleaning, and removal of site obstacles, deep and shallow foundations, isolation, construction joints, and mechanical load devices, reinforcement, and metallic works, bridge deck with the prestressing concrete system, bridge ramps with the soil reinforcement system, road lighting, roads, and asphalt works and traffic management, agriculture and Irrigation. • Bridge Distance: 750 LM in Length, 3 Lanes in Each Direction • Deck Type: Cast in Situ Deck Slap (Box Section) • Volume of Concrete: 10,000 M3 • Excavation: 20,000 M3 • Steel: 3,500 Tons