BRIDGES
Bridge and Underpass of Pr. Muteib St with Pr. Naif St with Al Khalifa Othman Bin Afan St – Dammam
231M
SAR
Total value
2016
-
Completion date
Length in K.m : 7.124
Volume of concrete ( lower Structures ): 62,835 m3
Volume of concrete ( Upper Structures ): 23,648 m3
Excavation: 26,337.66 m3
Prestressed Steel: 710.60 tons