Underpass
The completion construction of the tunnel King Khalid Road with King Fahd Road in Tabuk
91.9 M
sr
Total value
2023
-
Completion date
• Length: 1.1 LM • Volume of Concrete: 55,000 M3 • Excavation: 128,000 M3 • Steel: 6,600 Ton