BRIDGES

Construction Bridge of the intersection of Arafat Road with Aziziyah Road

89M

SR

Total value

2020

-

Completion date

• 900 M in length • Volume of concrete: 25,000 m3 • Excavation: 10,000 m3 • Steel:5,000 tons

BRIDGES

Preventing The Dangers From Storm And Rain Water Drainage For Municipalities Of Tabuk

Next Project