BRIDGES
Construction Bridge of the intersection of Arafat Road with Aziziyah Road



89M
SR
Total value
2020
-
Completion date
• 900 M in length • Volume of concrete: 25,000 m3 • Excavation: 10,000 m3 • Steel:5,000 tons