Construction of an underpass and bridge at the intersection of King Khalid Road and Khaled Bin Al Waleed Street – Taif
113.7 M
SR
Total value
Ongoing
-
Completion date
• Two directions with three traffic lanes, with one direction lane for stopping • The net length of the bridge: 580 meters • Bridge length with ascending and descending ramps: 1850 meters • Volume of Concrete: 40,000 M3 • Excavation Work: 90,000 m3 • Filling Work: 70,000 m3 • Steel: 7,300 Ton