BUILDINGS
Improvement & Upgrading of Storm Water Drainage – Makkah
67M
SAR
Total value
2007
-
Completion date
Concrete box culvert With different dimensions: 8,000 Im
Mountain side concrete channels: 3,100 Im
Concrete pipes with different diameters from 300 mm to 1000 mm 6,700 Im
Surface water streams: 4,500 Im
Works of asphalt: 74,000 m2
Volume of concrete: 26,000 m3
Excavation: 278,000 m3