BUILDINGS

Fire Water Tank in Muzdalifa – Makkah

23M

SAR

Total value

2007

-

Completion date

Retaining walls
The roof is made of pre-cast tiles and beams based on 150 internal columns
Tank capacity: 20,000 m3
Volume of concrete: 15,000 m3
Excavation: 200,000 m3

BUILDINGS

Taif Water Tank – Taif

Next Project