BRIDGES
Underpass of Pr. Saad With Haroon Rasheed St – Riyadh
93.7M
SR
Total value
2016
-
Completion date
"• 2 Directions, 3 lanes in each direction with separate metro lane at the center. • 900 m in length • Volume of concrete: 32,186 m3 • Excavation: 266,827 m3 • Steel: 5,296 tons"