Underpass of Pr. Saad With Haroon Rasheed St – Riyadh
93.7M
SAR
Total value
2016
-
Completion date
2 Directions
3 lanes in each direction with separate metro lane at the center
900 m in length
Volume of concrete: 32,186 m3
Excavation: 266,827 m3
Steel: 5,296 tons