BRIDGES

Aqabat Tilla – Assier

9M

SR

Total value

2010

-

Completion date

• 9 km in length • 9.5 m in width • Unclassified road excavation : 233,072.85 m³ 10% Rocky • Structural Excavation : 2,343 m³ • Volume of reinforcement concrete : 1,362 m3 • Asphalt ( wearing Course ) : 3,796 m3 • Road embankment : 118,078 m³