BRIDGES

Shuttle Roads – Phase III (Makkah)

113M

SR

Total value

2012

-

Completion date

"• Precast slabs and longitudinal beams pre-cast and Pre-stressed based on cross-beams and columns in place • Concrete bridge for pedestrians: 70m in length 10m in width • Concrete bridge for cars: 700 lm in length, 2 lanes in each direction. • Volume of concrete: 22,000 m3 • Excavation: 791,000 m3"

BRIDGES

Underpass of Pr. Saad With Haroon Rasheed St – Riyadh

Next Project